|
Projects > Hydropower > Pergau Hydroelectric Project - Stage 3
Pergau Hydroelectric Project - Stage 3Client:Tenaga Nasional Berhad (TNB) Description of Project:The Project consists of a 600MW underground power station drawing water from a dam located on the Sg Pergau just downstream of its confluence with the Sg Yong. The flow capture of the scheme is enhanced by the pumped transfer of water from adjoining southern catchments through a 24 km long aqueduct. A re-regulating pond adjacent to the Sg Pergau in the vicinity of Kg Lawa will control outflow from the power station. Principal features of the project include:
Services Provided:Following on from Stage 1 (Feasibility Study) and Stage 2 (Project Review) SMEC was retained by Tenaga Nasional Berhad (TNB) in a project management and quality assurance role as Supervising Engineer. Services included:
Content Management Powered by CuteNews
|