Penchala Tunnel Design Review 7/2002 - 9/2002

Client:

CMC di Ravenna Malaysia Sdn Bhd

Penchala Tunnel
 
Penchala Tunnel

Description of Project:

The project involved the review of preliminary and detailed design for 1.4 km of road tunnels in variable granitic rock as part of the Western Kuala Lumpur Traffic Dispersal Scheme.

SMEC Malaysia Sdn Bhd was engaged by the construction contractor (CMC di Ravenna Malaysia Sdn Bhd) to carry out an independent review of the tunnel design including assessment of the engineering geology and expected geological conditions, assessment of the adequacy of primary tunnel support and final lining, and review of the portal design including numerical modelling of the expected portal convergence using FLAC.

Services Provided:

Services provided by SMEC International as sub-consultant to the local consultant included:

  • review of geological investigations and engineering geology
  • review of preliminary design including tunnel construction and support techniques
  • review of detailed design including portal design, primary tunnel support and final tunnel lining